Product

XW-318 Epoxy Floor Paint

Composition and performance:

A two-component high-solid industrial floor coating made of solvent-free low molecular weight epoxy resin and wear-resistant aggregate.

The paint film is tough, has low shrinkage and high wear resistance

Excellent adhesion, wear resistance and impact resistance

Excellent resistance to salt spray, acid, alkali, salt and oil

Excellent chemical resistance

Use:

Used for industrial floors, apartment floors, factories, workshops, warehouse floors, sewage treatment pools, etc.


Technical indicators:

project

 Performance Indicators

color

Bright green, emerald green, gray, various colors

Status in the container

After stirring and mixing, there is no hard lump and it is in a uniform state

Construction

Trouble-free application

Coating appearance

Smooth

Gloss (60°)/°, ≥

80

Fineness/μm, ≤

25

Drying time/h, ≤                

                    Touch Dry                     

1.5

 twenty four

 Get down to business

Outflow time (ISO 6 cup)/s, ≥

100

Non-volatile matter/%,≥

55

Impact resistance/cm

50

Flexibility/mm

1

Pencil hardness

H

Cross-cut test/level

1

Water resistance (120h)

No bubbling, no shedding, slight discoloration allowed

Heat resistance (90±2℃, 120h)

No bubbles, no wrinkles

Alkali resistance (200μm 5% NaOH solution, 72h)

No abnormality

Acid resistance (200μm 5% H 2 SO 4 solution, 72h)

No abnormality

Gasoline resistance (48h)

No foaming, no softening, no stickiness


Construction instructions:

Main agent: curing agent = 5:1, stir evenly, add 10-15% epoxy diluent, and apply by high-pressure airless spray, brush or roller.


Floor surface treatment conditions:

The floor surface to be coated should meet the quality requirements of floor engineering construction in GB50209-95 "Construction and Acceptance Standards for Building Floor Engineering". Newly completed industrial floors must go through a certain curing period before construction. About three weeks in summer and about six weeks in winter. The surface cement slurry and adhesion must be removed, and the surface oil, water and dust must be removed. The holes and obvious depressions on the floor surface should be filled and leveled first. When the temperature is below 0℃ and the relative humidity is above 85%, the curing is poor and construction is not recommended.


Notes:

1. The paint should be stored in a low temperature, ventilated and dry place; away from fire and heat sources; the shelf life is one year in a cool and dry place.

2. The above information is written based on actual testing and usage experience of our company's technical personnel and can be used as a construction guide. However, due to differences in coating environments and supporting solutions, it is recommended that users conduct preliminary experiments and tests based on actual needs and uses before confirming use. Our company only guarantees the quality and stability of this product itself.

Inquiry Now

If you have any questions, please contact us promptly and we will answer your questions as soon as possible.