Composition and performance:
A two-component high-solid industrial floor coating made of solvent-free low molecular weight epoxy resin and wear-resistant aggregate.
The paint film is tough, has low shrinkage and high wear resistance
Excellent adhesion, wear resistance and impact resistance
Excellent resistance to salt spray, acid, alkali, salt and oil
Excellent chemical resistance
Use:
Used for industrial floors, apartment floors, factories, workshops, warehouse floors, sewage treatment pools, etc.
Technical indicators:
project | Performance Indicators | |
color | Bright green, emerald green, gray, various colors | |
Status in the container | After stirring and mixing, there is no hard lump and it is in a uniform state | |
Construction | Trouble-free application | |
Coating appearance | Smooth | |
Gloss (60°)/°, ≥ | 80 | |
Fineness/μm, ≤ | 25 | |
Drying time/h, ≤ | Touch Dry | 1.5 twenty four |
Get down to business | ||
Outflow time (ISO 6 cup)/s, ≥ | 100 | |
Non-volatile matter/%,≥ | 55 | |
Impact resistance/cm | 50 | |
Flexibility/mm | 1 | |
Pencil hardness | H | |
Cross-cut test/level | 1 | |
Water resistance (120h) | No bubbling, no shedding, slight discoloration allowed | |
Heat resistance (90±2℃, 120h) | No bubbles, no wrinkles | |
Alkali resistance (200μm 5% NaOH solution, 72h) | No abnormality | |
Acid resistance (200μm 5% H 2 SO 4 solution, 72h) | No abnormality | |
Gasoline resistance (48h) | No foaming, no softening, no stickiness |
Construction instructions:
Main agent: curing agent = 5:1, stir evenly, add 10-15% epoxy diluent, and apply by high-pressure airless spray, brush or roller.
Floor surface treatment conditions:
The floor surface to be coated should meet the quality requirements of floor engineering construction in GB50209-95 "Construction and Acceptance Standards for Building Floor Engineering". Newly completed industrial floors must go through a certain curing period before construction. About three weeks in summer and about six weeks in winter. The surface cement slurry and adhesion must be removed, and the surface oil, water and dust must be removed. The holes and obvious depressions on the floor surface should be filled and leveled first. When the temperature is below 0℃ and the relative humidity is above 85%, the curing is poor and construction is not recommended.
Notes:
1. The paint should be stored in a low temperature, ventilated and dry place; away from fire and heat sources; the shelf life is one year in a cool and dry place.
2. The above information is written based on actual testing and usage experience of our company's technical personnel and can be used as a construction guide. However, due to differences in coating environments and supporting solutions, it is recommended that users conduct preliminary experiments and tests based on actual needs and uses before confirming use. Our company only guarantees the quality and stability of this product itself.
If you have any questions, please contact us promptly and we will answer your questions as soon as possible.