Composition:
High-quality emulsion, nanomaterials, imported additives, high-quality pigments and fillers, deionized water, etc.
Features:
Strong covering power, excellent weather resistance and alkali resistance, good leveling, safe and non-toxic, and good construction performance.
Application:
Suitable for indoor and outdoor concrete, cement mortar surface, masonry structure, gypsum board surface painting.
Color:
According to color card or customer requirements.
Main technical indicators:
Project | Performance Indicators | |
Status in the container | After stirring and mixing, there is no hard lump and it is in a uniform state | |
Construction | Paint two layers of barrier-free | |
Coating appearance | Flat and smooth, the paint film has normal appearance | |
Fineness/μm,≤ | 25 | |
Drying time/h,≤ | Touch Dry | 1.5 |
Practical | 18 | |
Contrast ratio (white and light colors) | 0.96 | |
Low temperature stability | No deterioration | |
Scrub resistance,次≥ | 2000 | |
Alkali resistance | 120hNo abnormality | |
Volatile organic compound content(VOC/)(g/L),≤ | Not detected | |
Total of benzene, toluene, ethylbenzene and xylene/(mg/kg),≤ | Not detected | |
Free formaldehyde,mg/kg,≤ | Not detected | |
Freeze-thaw resistance of coating | No blistering, no powdering, no cracking after 10 times | |
Heavy Metals/(mg/kg) | Soluble lead | Not detected |
Soluble Cadmium | Not detected | |
Soluble Chromium | Not detected | |
Soluble mercury | Not detected |
Construction Guide:
1. The surface to be painted must be dry. New cement has strong alkalinity, so it must be completely dried before construction. The moisture content of the wall is required to be less than 8% and the pH is less than 10.
2. The all-purpose closed anti-alkali primer provided by our company is required.
3. Stir thoroughly before use. If dilution is required, dilute with tap water.
4. Dust, oil and other dirt attached to the wall must be cleaned before construction.
5. The interval between each layer of painting should not be less than 3 hours.
6. It can be applied by brushing, rolling, spraying and other processes.
7. The actual coverage rate will vary depending on the construction process, the roughness of the surface to be painted and the construction environment.
8. The construction temperature should not be lower than 5℃. The relative temperature should not exceed 85%.
Coating area:
Theoretical value 6-8 square meters/Kg·road.
Storage period:
12 months (10℃)
Note:
1. Latex paint should be placed in a room temperature, ventilated and dry place.
2. This manual is the accumulation of our practice and experience and can be used as a construction guide. Since the product use conditions are beyond our control, we are only responsible for the quality of the paint itself. This manual does not contain any guarantee.
If you have any questions, please contact us promptly and we will answer your questions as soon as possible.