Product

XW-8200 acrylic exterior latex paint

Composition:

High-quality emulsion, nanomaterials, imported additives, high-quality pigments and fillers, deionized water, etc.

Features:

Strong covering power, excellent weather resistance and alkali resistance, good leveling, safe and non-toxic, and good construction performance.


Application:

Suitable for indoor and outdoor concrete, cement mortar surface, masonry structure, gypsum board surface painting.


Color:

According to color card or customer requirements.


Main technical indicators:

Project

Performance Indicators

Status in the container

After stirring and mixing, there is no hard lump and it is in a uniform state

Construction

Paint two layers of barrier-free

Coating appearance

Flat and smooth, the paint film has normal appearance

Fineness/μm,≤

25

Drying time/h,≤

Touch Dry

1.5

Practical

18

Contrast ratio (white and light colors)

0.96

Low temperature stability

No deterioration

Scrub resistance,次≥

2000

Alkali resistance

120hNo abnormality

Volatile organic compound content(VOC/)(g/L),≤

Not detected

Total of benzene, toluene, ethylbenzene and xylene/(mg/kg),≤

Not detected

Free formaldehyde,mg/kg,≤

Not detected

Freeze-thaw resistance of coating

No blistering, no powdering, no cracking after 10 times

Heavy Metals/(mg/kg)

Soluble lead

Not detected

Soluble Cadmium

Not detected

Soluble Chromium

Not detected

Soluble mercury

Not detected



Construction Guide:

1. The surface to be painted must be dry. New cement has strong alkalinity, so it must be completely dried before construction. The moisture content of the wall is required to be less than 8% and the pH is less than 10.

2. The all-purpose closed anti-alkali primer provided by our company is required.

3. Stir thoroughly before use. If dilution is required, dilute with tap water.

4. Dust, oil and other dirt attached to the wall must be cleaned before construction.

5. The interval between each layer of painting should not be less than 3 hours.

6. It can be applied by brushing, rolling, spraying and other processes.

7. The actual coverage rate will vary depending on the construction process, the roughness of the surface to be painted and the construction environment.

8. The construction temperature should not be lower than 5℃. The relative temperature should not exceed 85%.


Coating area:

Theoretical value 6-8 square meters/Kg·road.


Storage period:

12 months (10℃)


Note:

1. Latex paint should be placed in a room temperature, ventilated and dry place.

2. This manual is the accumulation of our practice and experience and can be used as a construction guide. Since the product use conditions are beyond our control, we are only responsible for the quality of the paint itself. This manual does not contain any guarantee.

Inquiry Now

If you have any questions, please contact us promptly and we will answer your questions as soon as possible.