Composition:
Imported organic fluorine resin, acrylic resin, high-quality pigments and fillers, imported additives, organic solvents, etc.
Features:
The paint film is tough, smooth, has good adhesion, is resistant to water, acid and alkali, washable, has excellent UV resistance, strong weather resistance, and strong mildew resistance. Since the paint film is self-cleaning, it is particularly suitable for use on the exterior walls of urban buildings. This paint is packaged in a single component and is easy to use.
Uses:
Used for building exterior wall decoration and protection, suitable for: cement, masonry, lime, wood, steel surface, etc.
Color:
According to color card or customer requirements.
Main technical indicators:
Project | Performance Indicators | |
Status in the container | After stirring and mixing, there is no hard lump and it is in a uniform state | |
Construction | Paint two layers of barrier-free | |
Coating appearance | Flat and smooth, the paint film has normal appearance | |
Fineness/μm,≤ | 20 | |
Drying time/h,≤ | Touch Dry | 2 |
Practical | 24 | |
Adhesion (cross-hatch method) | 1级 | |
Non-volatile matter:% | 55 | |
Impact strength,kg·cm | 50 | |
Flexibility,mm | 1 | |
Freeze-thaw resistance of coating | No blistering, no powdering, no cracking after 20 times | |
Water resistance(120天) | No foaming, no powdering | |
Salt spray resistance(600h) | No foaming, no powdering | |
Sulfuric acid resistance(10%,168h) | No blistering, no powdering, no rusting | |
Hydrochloric acid resistance(10%,168h) | No blistering, no powdering, no rusting | |
Alkali resistance(10%,168h) | No blistering, no powdering, no rusting |
Construction Guide:
1. The surface to be coated must be dry. New cement has strong alkalinity, so it must be completely dried before construction. The moisture content of the wall is required to be less than 8% and the pH is less than 10.
2. If the wall is uneven, it needs to be polished with matching putty before construction.
3. The fully enclosed anti-alkali primer provided by our company must be used.
4. Stir thoroughly before use. If dilution is required, please use a special diluent.
5. Dust, oil and other dirt attached to the wall must be removed before construction.
6. The interval between each layer of painting should not be less than 4 hours.
7. It can be constructed by brushing, rolling, spraying and other processes.
8. The actual coverage rate will vary depending on the construction process, the roughness of the surface to be coated and the construction environment.
Coating area:
Theoretical value 7-9 square meters/kg·coat.
Storage period:
One year in a cool and dry place.
Notes:
1. The paint should be placed in a low temperature, ventilated, dry place, away from fire and heat sources. Work clothes, gloves and protective glasses must be worn during painting, and the construction should be carried out under well-ventilated conditions.
2. This manual is the accumulation of our practice and experience and can be used as a construction guide. Since the product use conditions are beyond our control, we are only responsible for the quality of the paint itself, and this manual does not contain any guarantee components.
If you have any questions, please contact us promptly and we will answer your questions as soon as possible.