XW-3302 Heavy Anti-corrosion Paint for Pier Steel Pile Repair

Composition and performance:

Two-component thick paste heavy anti-corrosion coating made of modified epoxy resin, imported additives, active diluent, high-quality anti-rust pigment, waterproof pigment, wear-resistant filler, coagulant (component A), and curing agent (component B)

The coating has excellent adhesion, wear resistance, seawater resistance, chemical corrosion resistance, and good construction performance. The dry film thickness of one scraping can reach 600-800μm. It can be used as a matching primer and a primer-top paint.


Application:

Suitable for repairing old steel piles at docks, can be cured quickly, and can be used with special primer for better results


Technical indicators:

project

   Performance Indicators

color

Iron red, dark gray

Status in the container

Slurry, no lumps after stirring and mixing, in a uniform state

Construction

Scraping and coating without any trouble

Coating appearance

Flat and smooth

Gloss (60°)/°, ≥

60

Fineness/μm,≤

50

Drying time/h,≤              

Touch Dry

0.5

24

Get down to business

Non-volatile matter/%,≥

95

hardness/H,≥

4

Wear resistance/(1000g/500r)g,≤

0.045

density,g/ cm3

1.71.8

Adhesion (pull-off method)/Mpa,≥

8

Salt water resistance (3% NaCl solution, 720h)

No abnormality

Water resistance (1200h)

No bubbling, no shedding, slight discoloration allowed

Heat resistance (90±2℃, 720h)

No bubbles, no wrinkles

Alkali resistance (5% NaOH, 120h)

No abnormality

Acid resistance (5% H2SO4, 120h)

No abnormality

Coating temperature change resistance (5 cycles)

No abnormality

Salt spray resistance (4000h)

No bubbles, no shedding



Construction method:

1. Surface treatment:

The coating surface must be thoroughly cleaned before coating, and it is required to be rust-free, oil-free, water-free and dust-free. Manual rust removal must reach the national standard St3 level, and sandblasting rust removal must reach the national standard Sa2.5 level.


2. Coating environment requirements:

Coating work should be carried out under weather conditions with an air temperature above 5°C and a relative humidity below 85%. The surface temperature of the steel should be 3°C higher than the dew point temperature.


3. Coating process:

Before coating, the components of the coating should be mixed and fully stirred according to the weight ratio of A: B = 13:1 required by the formula. When mixing, first stir A thoroughly and mix evenly, then add B component curing agent, and the prepared coating should be used up as soon as possible. To ensure the adhesion of the coating, the surface should be scraped with diluted paint after it is qualified. The reference ratio of dilution is A: B: diluent = 13: 1: (0.5~0.7). The thickness of the paint film should be strictly controlled to ensure that more than 90% of the measured points reach the specified thickness. It is allowed to repair the damaged or defective parts of the coating. Use sandpaper to roughen the coating within 300mm around the repaired part, and scrape the coating to make it level with the surrounding coating.


Notes:

1. The paint should be placed in a low temperature, ventilated and dry place; away from fire and heat sources; the shelf life is one year in a cool and dry place.

2. Before the coating is completely dry, it should be avoided from being polluted by rain or other liquids, and no one should step on it. The coated metal surface should not be constructed under direct sunlight in summer.

3. The above information is written based on the actual testing and use experience of our company's technicians, and can be used as a construction guide. However, due to the difference between the coating environment and the supporting plan, it is recommended that users conduct experiments and tests in advance according to actual needs and uses before confirming use. Our company only guarantees the quality and stability of this product itself.

Inquiry Now

If you have any questions, please contact us promptly and we will answer your questions as soon as possible.