Composition and performance:
Two-component high-solid industrial floor coating made of solvent-free low molecular weight epoxy resin as base material, with wear-resistant aggregate, weather-resistant pigment, etc.
The paint film is tough, has low shrinkage and high wear resistance
Excellent adhesion, wear resistance and impact resistance
Excellent resistance to salt spray, acid, alkali and salt, and oil
Excellent resistance to chemical media
Uses:
Used for industrial floors, apartment floors, factories, workshops, warehouse floors, sewage treatment pools, etc.
Technical indicators:
Project | Performance Indicators | |
Color | Various | |
Status in the container | After stirring and mixing, there is no hard lump and it is in a uniform state | |
Construction | Trouble-free application | |
Coating appearance | Smooth | |
luster(60°)/°,≥ | 70 | |
Fineness/μm,≤ | 40 | |
Drying time/h,≤ | Touch Dry | 12 72 |
Get down to business | ||
Non-volatile matter/%,≥ | 100 | |
Impact resistance/cm | 30 | |
Flexibility/mm | 3 | |
Pencil hardness | 2H | |
Cross-cut test/level | 2 | |
Wear resistance(750g/1000 turns)/g,≤ | 0.040 | |
Water resistance (120h) | No bubbling, no shedding, slight discoloration allowed | |
Heat resistance(90±2℃,120h) | No bubbles, no wrinkles | |
Gasoline resistance(48h) | No foaming, no softening, no stickiness | |
Alkali resistance (200μm 5% NaOH solution, 72h) | No abnormality | |
Acid resistance (200μm 5% H2SO4 solution, 72h) | No abnormality |
Construction instructions:
Main agent: curing agent: pre-agglomerate = 4:1:8, stir evenly, pour the main agent into the container first, add the pre-agglomerate while stirring, and finally add the curing agent and mature for 10 minutes. Considering the approximate ratio of quantity and area, pour the prepared topcoat onto the ground where the intermediate paint is completed, and use a rake with triangular teeth to level it. The tooth depth depends on the thickness of the paint film after self-leveling. After 30 to 45 minutes of construction, use a defoaming roller to eliminate residual air.
Floor surface treatment conditions:
The floor surface to be coated should meet the construction quality requirements of the floor engineering in GB50209-95 "Construction and Acceptance Standards for Building Floor Engineering". Newly completed industrial floors must go through a certain maintenance period before construction. About three weeks in summer and about six weeks in winter. The surface cement slurry and adhesion must be removed, and the surface oil, water and dust must be removed. The holes and obvious depressions on the floor surface should be filled and leveled first. The temperature is below 0℃ and the relative humidity is above 85%, which is poorly cured and is not recommended for construction.
Notes:
1. The paint should be placed in a low temperature, ventilated and dry place; away from fire and heat sources; the shelf life is one year in a cool and dry place.
2. The above information is written based on the actual testing and usage experience of our technical staff, and can be used as a construction guide. However, due to the differences in the coating environment and supporting solutions, it is recommended that users conduct experiments and tests in advance according to actual needs and uses before confirming use. The company only guarantees the quality and stability of this product itself.
If you have any questions, please contact us promptly and we will answer your questions as soon as possible.